HOW WE WORK
HOW WE WORK:
PROJECT LIFE CYCLE
We have a robust process, expertise and experience which enables us to analyse, design and implement small or large scale automation solutions. (click or touch boxes below for more detail)
STEP 1
USER REQUIREMENT SPECIFICATION
This can be a detailed customer requirement, or a list objectives that Innomech turn into an agreed requirement specification.
STEP 2
CONCEPTUAL DESIGN
- Establish a clear understanding of the problem
- Feasibility Studies
- Risk Analysis
The early stage design work enables a more in depth understanding of the processes involved and will highlight the various approaches and the risks and obstacles that need to be addressed.
STEP 3
USER REQUIREMENT SPECIFICATION
- FMECA and other tools
- Practical tests
Understanding risks at an early stage will help focus the design approach and highlight the cost and lead-time implications.
STEP 4
FUNCTIONAL SPECIFICATION
This describes the technical behaviour of the machine, directly relating to the user requirement specification
STEP 5
MECHANICAL DESIGN
Our design engineers use the latest 3D CAD to model and detail the systems components
STEP 6
ELECTRICAL DESIGN
Our design engineers use the latest 3D CAD to model and detail the systems components
STEP 7
MACHINE CONTROL DESIGN
Our control engineers select the most appropriate architecture for the application
STEP 8
SOFTWARE DESIGN
Our control engineers select the most appropriate architecture for the application.
STEP 9
SYSTEM BUILD
Our systems are built ensuring that the build documentation complies with our quality system, ensuring full component traceability. Our Quality System also demands that the equipment is tested to a customer agreed Factory Acceptance Test (FAT) before delivery
STEP 10
CODING
Our systems are built ensuring that the build documentation complies with our quality system, ensuring full component traceability. Our Quality System also demands that the equipment is tested to a customer agreed Factory Acceptance Test (FAT) before delivery
STEP 11
INTEGRATION
Our systems are built ensuring that the build documentation complies with our quality system, ensuring full component traceability. Our Quality System also demands that the equipment is tested to a customer agreed Factory Acceptance Test (FAT) before delivery
STEP 12
TESTING
Our systems are built ensuring that the build documentation complies with our quality system, ensuring full component traceability. Our Quality System also demands that the equipment is tested to a customer agreed Factory Acceptance Test (FAT) before delivery
STEP 13
HANDOVER
Systems handover may include delivery, site acceptance testing and installation but handover is not the end of the story we also support products